SUPPLY HIGH AUTO INTELLIGENT SANITARY WARE PLANTS-EPC SERVICE

“Hexiang Intelligent” was founded in 1998 years, with 23 years development and innovation, Hexiang Intelligent already become the leader in sanitary ware technology and machine supply. From 1998 year to now, Hexiang already undertook several hundred different scale EPC plants of sanitary ware as follows.

From 2016 To 2021

  • Design and make Indonesia ROCA 500000pcs/annual capacity sanitary ware project;
  • Design and make Nigeria 2500000pcs/annual capacity sanitary ware project in Africa;
  • Design and make Uzbekistan 500000pcs/annual capacity sanitary ware project;
  • Design and make Turkmenistan 800000pcs/annual capacity sanitary ware project;
  • To design and make Vietnam Viglacera project of 750,000/annual capacity;
  • To design and make Bangladesh 600000pcs sanitary ware project;
  • To design and make Vietnam Ceravi 400000pcs sanitary ware project;
  • To design and make Angola 200000pcs sanitary ware project;
  • To design and make Vietnam Lixil 600000pcs/annual hi-pressure casting project;
  • To design and make Thailand Cotto 100000pcs/annual hi-pressure casting project;
  • Design and make Kohler hpcm project;
  • Design and make Meilin Hpcm project;
  • Design and make Jomoo 600000pcs/annual capacity sanitary ware project;
  • Design and make Subor hpcm project;
  • Design and make Huida 4th sanitary ware project for 1 millions pcs/annual capacity;
  • Design and make Monopy sanitary ware project for 1 millions pcs/annual capacity;
  • Design and make Jiangmen Dongpeng sanitary ware project for 1 million pcs/annual capacity;
  • Design and make SSWW sanitary ware project for 1 million pcs/annual capacity;
  • Design and make Jiangxi Dongpeng sanitary ware project for 1 million pcs/annual capacity;
  • Design and make Jingdezhen Arrow sanitary ware project for 1 million pcs/annual capacity;
  • Design and make Dezhou Arrow sanitary ware project for 1 million pcs/annual capacity;
  • Design and make country garden 1 million pcs/annual in China;
  • Design and make others Hpcm project for 32 millions dollars turnover in 2017 year;

From 2013 To 2015

To design and manufacture lifting casting plants 70sets in Jomoo Ceramic Co in 13 year.

Making casting line 150sets in Huida in 13 year

Design and making lifting line in Roca Tangshan in 13 year

Making Hi-pressure casting line for wash basin for Kohler in 13 year.

Design and making casting workshop (dryer system and 220sets casting system) for Arrow.

l Making lifting casting machine 70sets for Dongpeng sanitary ware Co.

To make lifting casting machine 30sets for Meilin sanitary ware Co.

To make lifting casting machine for LIXIL Group in China.

To make casting line for Duravit in China.

To produce the cistern hi-pressure casting machine in Yongchun.

To design and make 200,000 pcs turnkey project for Falanduo in 2013.

To make 120 sets casting line in Chaozhou in 2014.

To make hi-pressure casting machine in Henan in 2014.

To make 50sets casting line in Arrow in 2014.

To make 3 sets water closet Hi-pressure casting line in 2014 for Meilin.

To make 40sets casting line for Arrow in 2014.

To make 100 sets casting line and testing machine in Tangshan area in 2014.

To make glazing line for Iran Armitage in 2014.

To make 100 sets lifting casting line for Jomoo in 2014.

To make lifting casting line for Morvirad in 2014.

To design and make turnkey project of 300,000 for Turkmenistan in 2015.

To design and make turnkey project of 700,000 for Bangladesh in 2015.

To design and make 4 sets hi-pressure for Thailand COTTO.

To design and make 2 sets water closet hi-pressure in Tangshan

To design and make 3 sets Hi-pressure in Chaozhou.

Others single machine--------------

From 2007 To 2012

To design and manufacture equipments served in workshop of raw material preparation, glaze preparation, mould preparation, forming, glazing and final quality control of the 11th Branch of Huahui Technology (China) Co., Ltd.;

To design and manufacture equipments served in workshop of forming, glazing and final production inspection of Milim G & G Ceramics Co.,Ltd.;

To design and manufacture equipments served in workshop of raw material, glazing preparation, forming, glazing and final production inspection, a project of annual capacity of 1.2 million pcs for Monopy;

To design and manufacture equipments served in workshop of raw material, glazing preparation, forming, glazing, drying and final production inspection, a project of annual capacity of 600000 pcs for Jomoo Group Co., Ltd;

To undertake Turnkey project, including design and manufacture, for Fujian Bolina Sanitaryware Co., Ltd., with annual capacity of 600,000 pcs;

Tangshan Cielo Ceramic Co., Ltd., with annual capacity of 1,000,000 pcs;

To undertake Turnkey project, Angola with annual capacity of 200,000 pcs;;

To undertake Turnkey project, including design and manufacture, for Fujian Joyou Ceramic Co., Ltd., with annual capacity of 1,000,000 pcs;

Supor factories in Liaoning annual capacity of 1,000,000 pcs in Jan, 2012

From 1995 To 2007

Equipments served in workshop of raw material preparation, glaze preparation, forming, glazing and final quality control of the 1st,2nd, 3rd, 4th, 5th,6th, 7th elaboration-ware works and 11th branch works of Tangshan Huida Ceramic (Group) Co., Ltd;

To undertake turnkey project of the whole technique designing and equipments manufacturing for Xinjiang Dipai Ceramic Industry Co., Ltd. 200000pcs;

Equipments served in the workshop of raw material preparation and forming of Huiyi Ceramic Co., Ltd. (locates at Yidu city Hubei province);  

The Vertical One-time Electronic-Demoulding Casting & Forming Line For Water closet, the sample-production-line-project of Hebei Provincial science & technique, applied in Tangshan Sanitary Ceramic Works;

Equipments served forming workshop of Tangshan Monopy Ceramic Co., Ltd. in 2007;

Turnkey project, including design and manufacture, for Wobasan Sanitary ware Company, D.P.R.Korea, with annual capacity of 200,000 pcs in Apr 2002;

Making 126 sets casting line for Tangshan Ceramic Plant in 2003;

Equipments served in workshop of raw material preparation, glazing, forming, final quality control and some instruments in Lab for extension project by Shandong Milim Sanitary Ceramic Co., Ltd. in 2003;

To design and manufacture equipments served in workshop of raw material preparation, mould preparation and glaze preparation of Chongqing Duravit Sanitary Ware Co., Ltd.in May 2004;

To design and manufacture equipments served in workshop of raw material preparation, glazing and forming of Tangshan Huali Ceramic Co., Ltd. in2004;

To design and manufacture equipments served in Technique Improvement Project of Shunde City Lehua (Arrow Brand)Ceramic Sanitary Ware Co., Ltd.,in Apr 2004;

To design and manufacture equipments applied in mould preparation , forming, glazing and final ware quality control of VIETNAM TAY SON PORCELAIN CO., LTD in Jun 2004;

To design and manufacture equipments served in workshop of mould preparation , raw material preparation , forming and glaze preparation of Tangshan Imex Sanitaryware Manufacturing Ceramic Co., Ltd. in Aug 2005

To design and manufacture equipments served in workshop of raw material preparation, glaze preparation, forming and final ware quality control of Tangshan Aoshen Fenghua Ceramic Co., Ltd. in Aug 2005;

To design and manufacture equipments served in workshop of forming and final ware quality control of. INDIA CERO SANITARY WARE CO.,LTD in Oct 2005;

To design and manufacture equipments served in workshop of raw material preparation, mould preparation, glaze preparation, forming and glazing and final ware quality control of Zhangzhou Wanhui Sanitary Ware Co., Ltd. in Dec 2005;

To design and manufacture equipments served in workshop of raw material preparation, glaze preparation, mould preparation, forming, glazing and final quality control of the 11th Branch of Tangshan Huida Ceramic (Group) Co., Ltd. in Jun 2006;

Casting Workshop

 

Glaze Preparation Section

Glazing Workshop

 

Semi Checking Workshop

 

Slip Preparation Section

 
PLEASE FEEL FREE TO CONTACT US
Add: No. 188, Yutang Road, Fengnan District, Tangshan City, Hebei Province, China 
Phone: +86 315 8381888 / +86 137 8552 7888
Copyright © Tangshan Hexiang Intelligent Technology Co.,Ltd  all rights reserved.Site Map. Technology by leadong

Contact Us